Update: 06/25/11
Here is my upper oil pan that had to be modified to fit the ARP mains and crank scraper.
Here is my progress by the end of today:
-----------------------------------------------------------------------
Update: 06/26/11
Got some more work done today. Turbo/Manifold combo is not bolted down tight, it's just on there so I can build turbo lines. I need a 45 degree AN fitting (ordered tonight) to finish that up so my lines are all set up. I'm now running an S14 water neck, so I was able to delete the hard line at the back of the head as well as the long SS line that wrapped around to the turbo from the hard line. I can also now run a normal heater hose to the heater core rather than the mickey mouse crap that most SRs run due to the hard line pointing the wrong way normally.
-----------------------------------------------------------------------
Update: 09/11/11
Engine is done. Going in the car today!
It's finally in the car! Lol
-----------------------------------------------------------------------
Update: Today!
Worked on some IC pipe routing today. Need to cut some more piping tomorrow to continue...